Almond
Holds the land all year
No figures for your district: its government crop records list no area or yield for this crop.
No price yet to estimate income
- Suits: Rain is enough
- Doesn't suit: Winters are too warm for it to fruit
- Suits: Soil 8/10
Why, and how to make it work Hide details
Water
Rain is enough, even in a dry year.
Needs about 1,030 mm of water here in its growing months. Rain gives about 2,470 mm it can use in a normal year, and 1,920 mm in a dry year.
Heavy rain here can waterlog it. Grow it on raised beds or land that drains well.
Temperature
Grows best at 12–35 °C on average, and survives 10–40 °C.
Here, in its growing months (day / night):
- Jun 31 °C / 25 °C
- Jul 31 °C / 25 °C
- Aug 31 °C / 26 °C
- Sep 31 °C / 25 °C
- Oct 31 °C / 23 °C
- Nov 28 °C / 17 °C
- Dec 25 °C / 14 °C
- Jan 24 °C / 12 °C
- Feb 27 °C / 14 °C
- Mar 31 °C / 18 °C
- Apr 32 °C / 22 °C
- May 32 °C / 23 °C
- Jun 31 °C / 25 °C
It needs a cold winter to flower: a coldest month averaging 12 °C or less. Here the coldest month averages 18 °C.
Soil
Soil for Almond: 8 out of 10 (good).
Not in the score: sulphur.
- Soil here is often more acidic than it likes.
- Many fields here are short of zinc, which it needs a lot.
- Many fields here are short of boron, which it needs a lot.
- Most fields here are short of phosphorus.
Likes pH 6.5–7.0.
How the soil score worksMoney
Yield: about 6.2 quintals an acre, the typical figure across India (no figures for your state).
A new planting gives its first real harvest after about 4 years. The money here is for plants already bearing.
No mandi or support price for this crop yet.
How to make it work
-
Short of phosphorus Your soil is likely short of phosphorus.
Add about a quarter more DAP or single super phosphate than the usual dose, at sowing.
Ask your Krishi Vigyan Kendra what to add for this crop.
-
Short of zinc Your soil is likely short of zinc.
Mix 10 kg of zinc sulphate per acre into the soil before sowing. One dose lasts two or three seasons.
Ask your Krishi Vigyan Kendra what to add for this crop.
-
Short of boron Your soil is likely short of boron.
Mix 4 kg of borax per acre into the soil before sowing.
Ask your Krishi Vigyan Kendra what to add for this crop.